№ | Project Title | Client | Brief description |
1 | KEP1 — pre-design BF of initial activities | KPO b.v. | Engineering Services |
2 | Project KEP 1 KEP 1, Brownfield, quantity risk analysis services | KPO b.v. | Engineering Services |
3 | Support for KEP 1 VAR 2 and bridge between KEP 1 Pre submissions | KPO b.v. | Engineering Services |
4 | Engineering package for Commissioning operations of the Karabatan Combined Cycle Power Plant | «Karabatan Utility Solutions» | Detail Design |
5 | Individual technical construction project for directional test well #80, №ЮЗМ-1, №185, №400, №401, №402, №202, №203, №506, on the Morskoye field (Ogaiskoye Block) and EP package | «KoZhan» JV | Individual technical project |
6 | Individual technical project for sidetracking of well #3 on the Ansagan field within interval 5100-5780m (along hole) | «ALMEKS PLUS» Firm | Individual technical project |
7 | Individual technical project for kick-off an drilling of directional part of well #51, №73, №86, №88 | ТОО «MNK «КazMunaiТeniz» | Individual technical project |
8 | Onsite technical supervision for the “West Eskene Railroad Complex. Kashagan Pilot Field Infrastructure Development Project.” | NCOC | Technical Supervision |
9 | Temporary drilling site for well #905 with an access road | KPO b.v. | Detail Design |
10 | Emergency motor road to well # 905 | KPO b.v. | Detail Design |
11 | Solid Wastes Disposal Area. Plugging of cells ## 12, 16 | KPO b.v. | Detail Design |
12 | Engineering survey of bridges and dykes of the field. | KPO b.v. | Detail Design |
13 | Access road to the Well CF2_V2 drilling site | KPO b.v. | Author’s Supervision |
14 | Temporary drilling site for well MBU_C03_INFILL_5_39 with an access road | KPO b.v. | Detail Design |
15 | Emergency motor road to well MBU_C03_INFILL_5_39 | KPO b.v. | Detail Design |
16 | Early Oil Production Satellite Control Room. Ventilation System Upgrade. Stage 2 | KPO b.v. | Detail Design |
17 | Detail Design. Connecting road # 21 repair. А Author’s Supervision | KPO b.v. | Detail Design |
18 | International Standards Registration with the RoK regulatory authorities.» | KPO b.v. | Engineering Services |
19 | Provision of Engineering Services | KPO b.v. | Engineering Services |
20 | Relocation of the existing Environment Monitoring Stations (EMS) with re-equipment (retrofitting). Access Roads. | KPO b.v. | Detail Design |
21 | Surveying and scanning of the site for underground utilities of well site INFILL-12 | KPO b.v. | Engineering Surveying |
22 | Access road to Well 905 | KPO b.v. | Detail Design / Author’s Supervision |
23 | Workover site for well 118 with an access road | KPO b.v. | Detail Design |
24 | Temporary site for well INFILL 12 with an access road | KPO b.v. | Detail Design |
25 | Temporary site for well INFILL 12 with an emergency road | KPO b.v. | Detail Design |
26 | Relocation of the existing Environment Monitoring Stations (EMS) with re-equipment (retrofitting). Access Roads. | KPO b.v. | Detail Design / Author’s Supervision |
27 | Temporary drilling site for well 9870 with an access road | KPO b.v. | Detail Design |
28 | Proof of Concept Study for KEP-1 | KPO b.v. | Engineering Services |
29 | Access road to the Well CF2_V1 drilling site | KPO b.v. | Detail Design / Author’s Supervision |