Industrial facilities

Project TitleClientBrief description
1KEP1 — pre-design BF of initial activitiesKPO b.v.Engineering Services
2Project KEP 1 KEP 1, Brownfield, quantity risk analysis services  KPO b.v.Engineering Services
3Support for KEP 1 VAR 2 and bridge between  KEP 1 Pre submissionsKPO b.v.Engineering Services
4Engineering package for Commissioning operations of the Karabatan Combined Cycle Power Plant «Karabatan Utility Solutions»Detail Design
5Individual technical construction project for directional test well #80, №ЮЗМ-1, №185, №400, №401, №402, №202, №203, №506, on the Morskoye field (Ogaiskoye Block) and EP package «KoZhan» JVIndividual technical project
6Individual technical project for sidetracking of well #3 on the Ansagan field within interval 5100-5780m  (along hole)  «ALMEKS PLUS» FirmIndividual technical project
7Individual technical project for  kick-off an drilling of directional part of well #51, №73, №86, №88ТОО «MNK «КazMunaiТeniz»Individual technical project
8Onsite technical supervision for the “West Eskene Railroad Complex. Kashagan Pilot Field Infrastructure Development Project.”NCOCTechnical Supervision
9Temporary drilling site for well #905 with an access road KPO b.v.Detail Design
10Emergency motor road to well # 905KPO b.v.Detail Design
11Solid Wastes Disposal Area. Plugging of cells ## 12, 16KPO b.v.Detail Design
12Engineering survey of bridges and dykes of the field. KPO b.v.Detail Design
13Access road to the Well CF2_V2 drilling site KPO b.v.Author’s Supervision
14Temporary drilling site for well MBU_C03_INFILL_5_39 with an access roadKPO b.v.Detail Design
15Emergency motor road to well  MBU_C03_INFILL_5_39KPO b.v.Detail Design
16Early Oil Production Satellite Control Room. Ventilation System Upgrade. Stage 2KPO b.v.Detail Design
17Detail Design. Connecting road # 21 repair. А Author’s SupervisionKPO b.v.Detail Design
18International Standards Registration with the RoK regulatory authorities.»KPO b.v.Engineering Services
19Provision of Engineering ServicesKPO b.v.Engineering Services
20Relocation of the existing Environment Monitoring Stations (EMS) with re-equipment (retrofitting). Access Roads.KPO b.v.Detail Design
21Surveying and scanning of the site for underground utilities of well site INFILL-12 KPO b.v.Engineering Surveying
22Access road to Well 905KPO b.v.Detail Design / Author’s Supervision
23Workover site for well 118 with an access road KPO b.v.Detail Design
24Temporary site for well INFILL 12 with an access roadKPO b.v.Detail Design
25Temporary site for well INFILL 12 with an emergency roadKPO b.v.Detail Design
26Relocation of the existing Environment Monitoring Stations (EMS) with re-equipment (retrofitting). Access Roads.KPO b.v.Detail Design / Author’s Supervision
27Temporary drilling site for well 9870 with an access roadKPO b.v.Detail Design
28Proof of Concept Study for KEP-1KPO b.v.Engineering Services
29Access road to the Well CF2_V1 drilling siteKPO b.v.Detail Design / Author’s Supervision
Close Menu