We, a team of highly qualified specialists, have been actively working for more than five years in the market for designing residential houses, offices, and various industrial facilities

Nursultan Nurlan

General Director

The total working experience in the field of oil and gas and industry is more than 16 years. Master of Science in Engineering, has two higher educations in the field of oil and gas industry and industrial economy. He has worked his way up from an engineer of “Dresser Services Inc.” company, “KazMunaiTeniz Offshore Oil Company” JSC to a deputy general director of “Satpayev Operating” LLP. Currently, under the leadership of Nursultan N.O. “Caspy Engineering” LLP is involved in the long-term foreground works of the Republic of Kazakhstan in the field of design and construction in the oil and gas industry.

Sarkulova Aigul

Deputy General Director on social issues

The total working experience in designing is more than 20 years. While working in design and estimate group “Guryevneftegazgeologiya”, “Caspy Stroi” LLP, “Caspy Engineering” LLP participated in the development and designing of sections: architectural and civil, steel and reinforced concrete structures, general plan, equipment technology by the projects of: “Gate Insaat Taahhut Sanayi ve Ticaret”, Agip KCO, NCPOC, “Punj Lloyd Kazakhstan LLP”, “Kazakhstan Petrochemical Industries Inc.” LLP, “Zhigermunaiservice” LLP, Construction Office SI of Atyrau region and etc.

Tleuov Nurlan

Deputy General Director Corporate Services

The total working experience is 18 years. While working in “Caspy Engineering” LLP as a Deputy Director General on general issues managed the design process from conclusion of contracts to the transfer of work performed to Customers: “Gate Insaat Taahhut Sanayi ve Ticaret”, Agip KCO, NCPOC, “Punj Lloyd Kazakhstan LLP”, “Kazakhstan Petrochemical Industries Inc.” LLP, “Zhigermunaiservice” LLP, Construction Office SI of Atyrau region and etc.

Sadvakassova Kulyash

Finance Director

The total working experience is 30 years, entered her labor force in 1984 at Guryev mechanical factory, worked as head of labor and wages department, later continued working in “Guryev-auto service” LLP as a deputy manager, engaged in financial and personnel issues. Since the beginning of 2000 she worked in “KazakhstanCaspianShelf” company as Payroll Accountant, in 2006 worked in “Witteveen Bos” company as a chief accountant, engaged in maintenance of accounting records and tax accounting to the full extent. Starting from April, 2014, has been working as Chief Financial Officer in “Caspy Engineering” LLP.

Amankossov Galymbek

Industrial Projects Manager

The total working experience in the oil and gas industry is more than. 11 years in the following companies: Tengizchevroil LLP (Tengiz field), Nobel Oil LLP (Oil Rocks), Kashagan BV LLP (Bolashak plant), Caspiy Meruerty Operating Company (Zhemchuzhina field). Participated in projects development, ordered materials with long delivery term to overhaul the existing plant and for capital projects, managed the reliability and design engineering team, planned a budget, resources, provided a technical consultation on piping and mechanics, manage contracting organizations by the project of design, procurement and construction, manage a project, contractor performance evaluation regarding designing, procurement and construction of supporting bases, production methods and schedules.

Shaltakov Arman

Industrial Projects Manager

The total working experience in the oil and gas industry is more than. 12 years in the following companies: KazTransGas LNG, Tengizchevroil, Siemens, Rosetti Kazakhstan LLP, Agip KCO, Lucoil Uzbekistan Operating Company and Kom-Munai LLP. Participated in the development of basic and detailed designs, ordered materials with long delivery term, managed an engineering group, planned a budget, resources, arranged a system, offices, office transport, provided a technical consultation on piping and rotating equipment, manage contracting organizations for designing, procurement and construction starting from the wells and including Oil treatment unit.

Abilgaziyev Askar

Industrial Projects Manager

The total working experience in the field of oil and gas and industry is more than 18 years. He has worked his way up from engineer to a leadership positions in the areas such as Facilities Engineering, Managing and Coordination of Turnarounds (Tengiz Gas Processing Plant), Metals and Welding, Assets Integrity management, Process Safety, and Management of Major Capital Projects (Chevronmunaigas).

Sakhualin Shyngis

Industrial Projects Manager

The total working experience in the field of oil and gas and industry is more than 13 years. Master of Science in Engineering. Experienced with Shell, Eni and KMG project management standards in different stage of project development. During 13 years worked for the following companies: “Agip KCO”, “KazMinaiTeniz Offshore Oil Company”, “Keppel FELS”, “Keppel Kazakhstan”, “Caspiy Meruerty Operating Company” (Zhemchuzhina field), CMOC/NCOC (KalamkasKhazarDevelopment).

Participated in projects development starting from engineering till construction and commissioning, managed steel structure construction team, managed the design engineering team, budget planning, resources, provided a technical consultation on steel structure constructability methodology for onshore and offshore structures including offshore logistics and transportation, manage contracting organizations by the project of design, manage a project, contractor performance evaluation regarding designing, procurement and construction of steel structure modules, pipe racks, barges, drilling platforms and other vessels.

Close Menu